MPC News Flash

Dutch HFR Reactor to Achieve Full Power by 9/9/10: The HFR reactor in Petten, Netherlands is being restarted from a February, 2010 shutdown. Full power is expected by September 9, 2010. 08/27/10

Chalk River Returns to Normal Operations - Beginning 8/17/10 the repaired reactor resumed it's normal 28 day operating cycle to produce medical isotopes. 8/18/10

Chalk River to Restart Soon - AECL has announced that the Chalk River reactor must only complete low power testing and will be back in service as soon as mid- August. 08/13/10

Chalk River Restart Delayed 10-15 Days - Due to the malfunction of three (3) detectors, the anticipated restart of the reactor has been delayed from 7/31/10 for 10 to 15 days. 07/30/10

SrI(Eu) Crystal Detectors Developed for Radiation Detection - Lawrence Livermore researchers have developed a new radiation detector for gamma radiation from SrI(Eu). 07/20/10

CT Dose Reductions of 95% Reported via New Image Processing Algorithm - At the recent AAPM national meeting, Mayo Clinic researchers reported large dose reductions. 07/20/10

Cardiac CT Effective Dose/DLP Calculated - Cardiac CT effective does / DLP ratios were noted to be 70% higher than chest CT due to radiosensitivities differences. 6/29/10

 

»More MPC News

 

Medical Physics News

CAD labels abdominal vessels with improved accuracy
A new computer-aided detection (CAD) algorithm automatically labels abdominal (more)
ImageWorks promotes Thacher
Imaging equipment provider ImageWorks has elevated Marc Thacher to vice president (more)
ImaCor signs Pellerito
Transesophageal echocardiography probe developer ImaCor has tapped imaging (more)
Records 10 to 12 of 12
First Prev